The Application is done by roller, brush or sometimes by spray gun, in 2 to 3 coats, adequately diluted and with 24 hour intervals. In the case of varnishing reservoirs, only add water to the tank 5 days after the last coat.
Coverage
9m2/L
Obs. Coverage
Diluente Epóxi 10-15% / 5-10%
What are you painting?
* To save you must enter your email
DIMENSIONS
Quantity of product required / 1 Coats
Painted area: 0.00 m2
Volume: 0.00 L
NO CALCULATIONS TO SEND.
FILL THE MAIL FIELD TO OBTAIN SUMMARY OF CALCULATIONS.